Search


City of Redding
PO Box 496071
777 Cypress Ave
Redding, CA 96001

(530)225-4000 Phone
(530)225-4495 Fax
    John Szychulda
    Wastewater Utility Supervisor
    Stillwater Wastewater Treatment Plant
      530-378-6702
      jszychulda@ci.redding.ca.us

The Stillwater Wastewater Treatment Plant consists of:
  • Six positions
  • Average dry weather flow is 3 MGD
  • Average wet weather flow is 9 MGD
  • Projects include Outfall Diffuser Repair and Plant Expansion
  • Goal is to treat the influent wastewater to high quality standards, protect the environment and receiving waters, operate and maintain the treatment plant safely in compliance with best management practices.


STILLWATER WASTEWATER TREATMENT PLANT
 

© 2004 City of Redding. All Rights Reserved. | Legal - Website Statistics