The City of Redding Eastside Parallel Sewer Interceptor Initial Study/Negative Declaration,
produced by Pacific Municipal Consultants, is available below in Adobe Acrobat® PDF format.
At the bottom of this page, is the entire document as a single PDF file.
If you do not already have the Adobe Acrobat Reader, you can dowload it here:
.


Eastside Parallel Sewer Interceptor
Initial Study/Negative Declaration
Table of Contents

1.0 INTRODUCTION (22kb)

2.0 PROJECT INFORMATION (131kb)

3.0 PROJECT DESCRIPTION (840kb)

4.0 EVALUATION OF ENVIRONMENTAL IMPACTS

5.0 DETERMINATION (15kb)

LIST OF FIGURES


The entire Eastside Parallel Sewer Interceptor Initial Study/Negative Declaration document as a single PDF file:
Eastside Parallel Sewer Interceptor Initial Study/Negative Declaration (2,266kb)